Case sharing
1. Background of project
Client’s type: catering and restaurant overall temperature control
Client’s space:restaurant lobby of 200 square meters.
Main requirement: Restaurant premises are large, the overall cooling to achieve the appropriate temperature of the human body feeling comfortable, energy-saving air conditioning.
* Industrial Energy Saving Air Conditioner 3 Cold Heat Exchange For Low Electric Consumption
Solutions
Technology solution: Adoption of air-cooled + water-cooled + evaporative cooling 3-cooled heat transfer air-conditioning technology.
Equipment used: 1 unit(DHF-A-10P-A)
* 16 KW Power Efficient Air Conditioner Evaporate Cooling Water Cooling Air Cooling
Catering industry back kitchen cooling project
1. Name of client: XXX International Hotel
Space size of client’: It occupies 35000 sq.ms,combines comprehensive services as catering,meetins,commercial,bridals etc.
Core requirements:
A. It has high temperature in rear kitchen of summer
More chef staff in the back kitchen, hope to cool down temperature during cooking and not to affect the fire
* Solutions: Installed Dahanfeng commercial kitchen air conditioner to realize the cooling purpose.
DHF-CF-4P(Standard type)
* R22 Commercial Kitchen Air Conditioner 48000 BTU Integrated System
environment
Project background:
Dehumidification air conditioning upgrade in the drying workshop of XX paper mill
Industry: Paper industry
Core needs:
The humidity in the workshop is >85% for a long time, resulting in unstable moisture content of paper;
The energy consumption of traditional dehumidifiers accounts for 25% of the total electricity consumption of the production line;
The demand for steam exhaust heat recovery is urgent.
Project background:
XX chemical plant explosion-proof workshop air conditioning system transformation
Industry: chemical manufacturing
Core requirements:
There are flammable and explosive gases in the workshop, which must meet ATEX explosion-proof certification;
Strong acid and alkaline gases corrode traditional air conditioning equipment;
The workshop temperature in summer can reach 50℃, affecting production safety.
Project Background:
XX Biopharmaceutical Workshop Sterile Environment Transformation
Industry: Biopharmaceutical
Core Requirements:
Air conditioning system must comply with FDA/GMP dynamic cleanliness standards;
Disinfection and sterilization shorten the life of traditional air conditioners;
There is a risk of cross contamination in the exhaust system.
Project background:
XX Textile Group Intelligent Constant Humidity Energy Saving Project
Industry: Textile Printing and Dyeing
Core requirements:
Humidity fluctuations in workshops lead to an increase in yarn breakage rate;
Electricity costs of traditional air conditioners account for 18% of production costs;
Cotton wool and dust clog the filter of traditional air conditioners.