Project background:
Customer name: XX Automobile Manufacturing Co., Ltd.
Industry: Automobile manufacturing
Plant scale: 200,000 square meters of floor space, 80,000 square meters of workshop area
Pain points:
The original traditional air-conditioning system has high energy consumption, and the electricity bill in summer accounts for more than 35% of the total energy consumption;
The temperature and humidity in the workshop fluctuate greatly, affecting the stability of the production process;
The carbon emission index does not meet the industry's environmental protection requirements, and green upgrades are urgently needed.
Project background:
Customer name: XX Automobile Manufacturing Co., Ltd.
Industry: Automobile manufacturing
Plant scale: 200,000 square meters of floor space, 80,000 square meters of workshop area
Pain points:
The original traditional air-conditioning system has high energy consumption, and the electricity bill in summer accounts for more than 35% of the total energy consumption;
The temperature and humidity in the workshop fluctuate greatly, affecting the stability of the production process;
The carbon emission index does not meet the industry's environmental protection requirements, and green upgrades are urgently needed.